[Wrf-users] PGFIO-F-219 Error

Aishwarya spaceaish at gmail.com
Fri Jan 6 11:10:40 MST 2012


Hi everybody,

I'm presently running WRF recent version with PGF compiler. While running
.real.exe,after obtaining WPS met_em* files, I'm getting this error :

PGFIO-F-219/formatted write/internal file/attempt to read/write past end of
record.
In source file ../dyn_em/module_initialize_real.f90, at line number 671

I've also included the entire list of messages I receive after typing
.real.exe

./real.exe
 Namelist dfi_control not found in namelist.input. Using registry defaults
for variables in dfi_control
 Namelist tc not found in namelist.input. Using registry defaults for
variables in tc
 Namelist scm not found in namelist.input. Using registry defaults for
variables in scm
 Namelist fire not found in namelist.input. Using registry defaults for
variables in fire
 --- NOTE: sst_update is 0, setting io_form_auxinput4 = 0 and
auxinput4_interval = 0 for all domains
 --- NOTE: grid_fdda is 0 for domain      1, setting gfdda interval and
ending time to 0 for that domain.
 --- NOTE: both grid_sfdda and pxlsm_soil_nudge are 0 for domain      1,
setting sgfdda interval and ending time to 0 for that domain.
 --- NOTE: obs_nudge_opt is 0 for domain      1, setting obs nudging
interval and ending time to 0 for that domain.
 --- NOTE: num_soil_layers has been set to      4
 REAL_EM V3.3.1 PREPROCESSOR
  *************************************
  Parent domain
  ids,ide,jds,jde             1           74            1           61
  ims,ime,jms,jme            -4           79           -4           66
  ips,ipe,jps,jpe             1           74            1           61
  *************************************
 DYNAMICS OPTION: Eulerian Mass Coordinate
    alloc_space_field: domain             1 ,                 120563784
bytes allocated
Time period #   1 to process = 2000-01-24_12:00:00.
Time period #   2 to process = 2000-01-24_18:00:00.
Time period #   3 to process = 2000-01-25_00:00:00.
Time period #   4 to process = 2000-01-25_06:00:00.
Time period #   5 to process = 2000-01-25_12:00:00.
Total analysis times to input =    5.

 -----------------------------------------------------------------------------

 Domain  1: Current date being processed: 2000-01-24_12:00:00.0000, which
is loop #   1 out of    5
 configflags%julyr, %julday, %gmt:         2000           24    12.00000
  metgrid input_wrf.F first_date_input = 2000-01-24_12:00:00
  metgrid input_wrf.F first_date_nml = 2000-01-24_12:00:00
 d01 2000-01-24_12:00:00 Timing for input          0 s.
 Max map factor in domain 1 =  1.03. Scale the dt in the model accordingly.
PGFIO-F-219/formatted write/internal file/attempt to read/write past end of
record.
 In source file ../dyn_em/module_initialize_real.f90, at line number 671

Thank you very much,
Aishwarya.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://mailman.ucar.edu/pipermail/wrf-users/attachments/20120106/77dc0ae2/attachment.html 


More information about the Wrf-users mailing list