[Go-essp-tech] go-essp tech telco schedule
Bryan Lawrence
bryan.lawrence at stfc.ac.uk
Fri May 28 03:36:11 MDT 2010
hi Folks
We have a number of important telco requirements now:
- Sylvia and Luca (and myself) all agree we need a metadata pipeline
telco asap (Sylvia, sorry about the silence, it's not that I don't care
:-)
- Balaji has reminded us we need a data node installation nuts and
bolts telco
At the same time, I have proposed a PI meeting in the same slot, this
Tuesday. I appreciate that doing so is guzumping the two important
issues above, but there are some strategic issues I think we need to
resolve even as we confront these important practical issues.
So, assuming that next tuesday's telco is "invitee only" (you know who
you are) ... I would propose to have the metadata pipeline telco and the
data node telco on the following weeks, i.e
metadata pipleline on the 8th and
esg data node installation on the 15th.
Or, do we need to have these other telcos even sooner, in which case we
may need to schedule some extra slots. My preference would be to try and
use the existing slots, but some of you may think things are more
urgent. Comments please?
Regards,
Bryan
--
Bryan Lawrence
Director of Environmental Archival and Associated Research
(NCAS/British Atmospheric Data Centre and NCEO/NERC NEODC)
STFC, Rutherford Appleton Laboratory
Phone +44 1235 445012; Fax ... 5848;
Web: home.badc.rl.ac.uk/lawrence
More information about the GO-ESSP-TECH
mailing list