<div dir="ltr">Hi,<div><br></div><div>I have a series of plots where each point on the x-axis is 15 minutes. My xy plot connects those data points with lines nicely as expected. But on some plots, non-missing data points only exist every 30 minutes, which results in isolated points, and no line segments connecting them because of the missing data in between. I would like to be able to connect a data point with a line to the next non-missing data point in the series. Is there a simple or straightforward way, short of redefining new data arrays and x-axis arrays that omit the missing data points, that can accomplish that task?</div><div><br></div><div>Jared</div><div><div><br></div>-- <br><div class="gmail_signature"><div dir="ltr"><div><div><div><div><div><font face="courier new, monospace">===============================<br>Jared A. Lee, Ph.D.<br></font></div><font face="courier new, monospace">Project Scientist I<br></font></div><font face="courier new, monospace">Research Applications Laboratory<br></font></div><font face="courier new, monospace">National Center for Atmospheric Research<br>Boulder, Colorado, USA<br><br></font></div><font face="courier new, monospace">Email: <a href="mailto:jaredlee@ucar.edu" target="_blank">jaredlee@ucar.edu</a> (w)<br></font></div><font face="courier new, monospace">Phone: 303.497.8485 (w)</font><div><font face="courier new, monospace">Web: <a href="https://staff.ucar.edu/users/jaredlee" target="_blank">https://staff.ucar.edu/users/jaredlee</a><br>===============================</font><br></div></div></div>
</div></div>