<div dir="ltr"><div><div>Dear NCL users<br><br></div>I&#39;m plotting precipitation trends and overlying with the probability (p&lt;0.05)<br> .....  <br>    plotA0 = gsn_csm_contour_map_ce(wks,trend_jjas,res)  <br>    plotB0 = gsn_csm_contour(wks,prob_jjas,res2)<br>    plotB0 = ShadeLtContour(plotB0, 0.0499, 17)       ; shade all areas less than the 0.05<br> .....<br><br></div>However, when it comes to create the panel plot it takes around 2 hours just to print the figure in .eps <br><div><br></div><div>Is there any way to improve this time or I&#39;m doing something wrong in the script? <br><br></div><div>I&#39;ve attached the working example and the data can be found here (<a href="https://www.dropbox.com/sh/1srk2adshj8f4n0/AAA8J9L-hEhZshCsXkCAFycua?dl=0">https://www.dropbox.com/sh/1srk2adshj8f4n0/AAA8J9L-hEhZshCsXkCAFycua?dl=0</a>)<br><br></div><div>Thank you <br></div><div> Izidine<br></div><div><br clear="all"><div><div><div><div class="gmail_signature">







</div></div>
</div></div></div></div>